About Us

Company Profile

Helius New Energy Co., Ltd. is a pioneer in the construction and operation & maintenance of domestic molten salt projects. Committed to promoting the application of various energy storage technologies with “molten salt energy storage” at the core, we are dedicated to becoming a platform for the investment, construction, and management in the field of new energy storage.

Founded in January 2018 with a registered capital of 1.1245 billion yuan, we focus on three core strategic business development directions: "Concentrated Solar Power (CSP)+", "Plant Operation & Maintenance+" and "Molten Salt Energy Storage+". We wholly own two molten salt tower CSP projects in Delingha, Qinghai, with installed capacities of 10MW and 50MW, respectively.

  • The number of patents we have filed

    30+

  • The total installed capacity of CSP plants that we have undertaken (including operation and maintenance) reaches

    660MW

  • The installed capacity of reserve investment projects exceeds

    1GW

Company Milestones

January 8, 2018

Helius New Energy Co., Ltd. was established with a registered capital of RMB1,124,514,000.

December 1, 2018

The Delingha 50MW Tower CSP Plant has been connected to the grid for power generation. It is one of the first batch of CSP demonstration projects in China and the largest single project invested by Zhejiang Province in pairing assistance to Qinghai.

December 1, 2020

Qinghai Zhongkong Solar Power Generation Co., Ltd. is wholly owned by Helius New Energy Co., Ltd.

November 1, 2021

The Xizi Aviation Zero-Carbon Intelligent Energy Center Project, whose general contractor is Helius New Energy Co., Ltd., has been successfully put into operation.

December 1, 2022

The accumulative actual power output of Delingha 50MW CSP Plant in 2022 was 146.4 million kWh, reaching 100.26% of the annual designed power output, making it the first molten salt energy storage tower CSP plant that has fully achieved its production targets in China and even in the world.    

December 1, 2023

The accumulative power output of the Delingha 50MW CSP Plant in 2023 was 152.4 million kWh, reaching 104.4% of the annual designed power output, making it the first molten salt energy storage tower CSP plant that has fully achieved its production targets in China and even in the world for two consecutive years.